E-TEC Project Synopsis

 

Project No:  03-3121 Connelly School of the Holy Child

Type of work:

New Construction- School

 

Location:

Potomac, Md.

                   

Owner:

Connelly School of the Holy Child

General Contractor:

Coakley / Williams

Completion Date:

August 2002

Construction Details:

This project was an additional headmaster's building with a library, music center, life science training center, art and several other specialized classrooms. This 3 story building was utilized to expand the existing school to accommodate the growing student enrollment. This project provided a unique requirement for unique lighting requirements and attention to detial. This project contained several millwork arrangements which required extraordinary coordination to provide the desired result. The project had 1-600A utility style switchboard, 600+ lighting fixtures, 8 panelboards, 150+ point fire alarm system, public address system, security system, and 500+ branch circuits.